Testing of PV Power Plants
The laboratory provides PV power plant testing service in accordance to Chinese standards CNCA/CTS0004, CNCA/CTS 0016) and IEC 62446-1 standard, using advanced power station testing equipment to provide authoritative third-party testing data and analysis reports for PV power plants in various stages (construction, operation, trading, etc.).
Our business covers:
² PV Power plant investment feasibility/profitability assessment consulting;
² Overall value evaluation of PV power plant;
² PV power plant acceptance testing;
² PV power plant performance testing;
² PV power generation system performance parameters (PR value) calculation;
² Operational evaluation (generation efficiency, attenuation) for PV power plants.
We have a professional testing team, be ready to serve you at any time.
The following is our testing scope, welcome your inquiries. (Tel: +86 519-81581728 E-mail:hc01@nanayumemarche.com)
Category | Product | Test items | Testing (method) standards |
PV power plant | PV power plant | Infrared (IR) scanning | CQC : CNCA/CTS0016-2015 Guideline of performance testing and quality assessment for grid-connected PV power plants |
Average dust loss in photovoltaic group series | |||
Temperature rise loss in photovoltaic group | |||
Average power attenuation of PV module | |||
Electroluminescence (EL) scanning | |||
Module bypass diode detection | |||
Series parallel mismatch loss of centralized Inverters | |||
Series parallel average mismatch loss of series inverter | |||
DC line loss of PV system with centralized inverter | |||
DC line loss of PV system with series inverter | |||
Shielding loss between photovoltaic array | |||
AC average line loss of centralized Inverters | |||
AC average line loss of series inverters | |||
Weighted efficiency of inverter | |||
MPPT tracking precision of inverter | |||
Transformer weighted efficiency | |||
Insulation resistance test of PV array | |||
Grounding continuity test | |||
Network power quality | |||
Performance ratio of power station to PR value | |||
Standard performance ratio of power station | |||
Performance ratio of inverters | |||
PV system | Testing of protective devices and equipotential bodies | CGC : CGC_GF003.1-2009 Basic acceptance requirements for grid-connected PV systems | |
Polarity test | |||
Test of series current of photovoltaic group | |||
Functional testing | |||
Insulation resistance test of PV array | |||
Nominal power test of PV array | |||
Power quality test | |||
System electrical efficiency test | |||
Grid-connected PV systems | Continuity of protective earthing and/or equipotential bonding conductors | IEC 62446-1:2016 Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection | |
Polarity test | |||
PV string - Open circuit voltage measurement | |||
PV array –circuit test | |||
Functional test | |||
PV array insulation resistance test | |||
String I-V curve measurement | |||
PV array infrared camera inspection | |||
Voltage to ground - Resistive ground systems | |||
PV array - Wet insulation resistance test | |||
PV string combiner box test | |||
Blocking diode test | |||
Shade evaluation |